Luminaire efficacy
According to BRE’s The essential guide to retail lighting:
A luminaire is a ‘Light fixture or fitting; an electrical device used to create artificial light and / or illumination, by use of an electric lamp.’
Luminaire efficacy is the ‘Light output of an entire luminaire divided by the total power consumed by the lamps and ballasts. Equal to the lamp efficacy multiplied by the light output ratio of the luminaire.’
It is expressed in lumens per Watt (lm/W).
Ballast or control gear, is ‘Part of the control equipment of fluorescent or discharge lamps, used to stabilise the current. The older, traditional main-frequency ballast can consume up to 20-25% of the total lamp current. A modern electronic ballast working at high frequency consumes about 30% less current, and can be used to regulate or dim the lamp output.’
[edit] Related articles on Designing Buildings Wiki
- Ballast or control gear.
- Colour appearance.
- Colour Rendering Index CRI.
- Daylight benefits in healthcare buildings.
- Daylight factor.
- Daylight lighting systems.
- Dichroic reflector.
- Discharge lamp.
- Extra-low voltage lamps.
- General lighting v task lighting.
- Illuminance.
- Lamp.
- Lamp efficacy.
- Lighting.
- Lighting energy numeric indicator LENI.
- Lighting of construction sites.
- Luminaire.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.

















